DagLichtDesign
Home
Roof lanterns
For contractors About us
Inspiration
Regions
Contact Request a quote
Questions answered

How do you cover a roof lantern during building work?

During building work you cover two things: the open roof opening before the roof lantern is in, and the glass once it has been fitted.

  • Own factory in Barneveld
  • Lead time from 2 weeks
  • Quote within 24 hours
Google-rating: 5.0★★★★★from 2 reviews
Build your quote

Put together your quote

A free, no-obligation quote tailored to you in just a few clicks. You finish on the quote page, where everything is already filled in.

Lean-to roof lantern on a flat roof Gable roof lantern on a flat roof Lean-toGable
123456
Step 1 of 6

Which roof lantern are you looking for?

Feel free to choose more than one option.

What are the dimensions?

The outside size of the opening or upstand, in centimetres. A good estimate is fine.

Where will the roof lantern go?

So we know what to take into account.

When would you like the roof lantern?

An estimate is fine.

Add a photo, sketch or drawing? (optional)

A photo of your roof or a sketch with dimensions helps us make an accurate quote. You can also skip this.

Where should we send the quote?

You will receive the quote in your inbox within 24 hours.

Free and no obligationDone in 1 minuteQuote within 24 hours
The short answer

During building work you cover two things: the open roof opening before the roof lantern is in, and the glass once it has been fitted. You close the opening temporarily with a board on battens and a sheet laid to a fall. You protect the fitted glass from dust, plaster splashes and scratches with a soft covering and tape that comes off again quickly.

Covering the roof opening before the roof lantern arrives

As soon as the roof is opened up, your project is at risk. One shower is enough for wet insulation and stains on a new ceiling. So keep the time the opening lies exposed as short as possible, and cover it well in the meantime.

A sturdy board on battens over the upstand works best, with a heavy tarpaulin over it that hangs well past the edge and is fixed in place. Give the board a fall so water runs off instead of pooling. If an existing dome is being replaced, also read how to replace a rooflight dome with a roof lantern.

  • Board on battens over the upstand, laid to a fall
  • Heavy tarpaulin hanging well past the edge
  • Fix the tarpaulin against wind, do not just weigh it down
  • Check it after every shower

Plan delivery so the opening is exposed only briefly

The simplest protection is a short wait. DagLichtDesign delivers from 2 weeks after approval, and the mono-pitch roof lantern in 1, 2 and 3 metres is always in stock. Read more about planning in the lead time of a roof lantern.

You collect the roof lantern by appointment in Barneveld or have it delivered on an agreed date. Match that date to the day your contractor has the upstand ready. The roof then opens and closes again the same day or shortly after.

Protecting the fitted glass during building work

After installation the building work often carries on for weeks. Inside there is plastering, sanding and painting; outside the roof covering is being finished. Glass and aluminium then have to put up with dust, cement splashes and sometimes a loose brick.

Cover the glass on the inside with sheeting or cardboard, fixed to the frame and not to the glass. Outside, a soft blanket or board protects the glass while work is done on the roof. Never put tools or materials on the roof lantern, not even for a moment.

  • Protective sheeting inside, tape on the frame rather than the glass
  • Tape that does not bake on in the sun, and not left on for weeks
  • A soft cover outside whenever there is work on the roof
  • Wipe off cement and lime straight away with clean water

After the building work: clean and check

Remove all covers as soon as the dirty work is done. Tape left in the sun for a long time leaves adhesive residue that is hard to remove. Then clean the glass with water and a mild soap, as described in roof lantern maintenance and cleaning.

Finally, check that the seals all round are still intact. A sealant joint that was knocked during the work can leak later. If you see moisture, read what to do when a roof lantern leaks.

Frequently asked questions

How long can a roof opening be left open?

As briefly as possible. Well covered, an opening can bridge a few days, but every extra day is a risk in rain and wind. So plan delivery for the day the upstand is ready. The step-by-step installation plan helps you with the order of work.

Can I put masking tape on the glass?

Preferably not, and certainly not for more than a few days. In the sun the adhesive bakes on and leaves residue. Tape to the frame and use tape suitable for outdoor use and UV.

What if plaster gets on the glass?

Wipe it off straight away with plenty of clean water and a soft cloth. If you let it dry, scraping it off can scratch the glass or a coating. Never use a scouring pad or steel wool.

Want to know what your roof lantern costs?

Send a photo or sketch with dimensions. Within 24 hours you receive a quote with glazing options, lead time and price.

Request a quote Get in touch

Read more

A quick quote in your inbox?

A few questions, a photo or the dimensions, and we will prepare a tailored quote. Prefer to call: +31 342 223 190.

Request a quote More information
Make a request